U.S. Green Building Council Member

Industrial Projects


DCT Greenleaf

2567 Greenleaf Ave Elk Grove Village, Illinois

110,000 sq ft Industrial Redevelopment

Industrial redevelopment with targeted demolition of the existing building’s interior docks and segmented re-utilization of the existing structure

The original building was constructed with obsolete gemonetry, building envelope materials and mechanical and electrical systems

New exterior façade constructed with insulated precast wall panels and a glass curtain wall entryway

New electrical service, T5 energy-efficient lighting, fire sprinkler system, audio visual modifications and 5,800 square feet of additional office space

Redesigned truck docking station with 13 exterior bays allows for onsite truck maneuvering, minimizing local truck traffic with regulated movement at entry and exit points

Onsite underground water detention allows for the new truck court and more usable space

Think beyond the build.

  • CORPORATE HEADQUARTERS

  • 1000 W Irving Park Rd
  • Ste 200
  • Itasca, Illinois 60143
  •  
  • P 847.297.4200
  • F 847.297.4205
  • SOUTHEAST DIVISION CGC 1517224

  • 7901 SW 6th Court
  • Ste 100
  • Plantation, FL 33324
  •  
  • P 954.530.6972
  • F 954.697.7676
  • SOUTHWEST DIVISION CGC 1005104

  • 16530 Bake Parkway
  • Ste 101
  • Irvine, California 92618
  •  
  • P 949.333.2261
  • F 847.297.4205
  • NORTHEAST DIVISION

  • 517 Rte One South
  • Ste 1002
  • Iselin, NJ 08830
  •  
  • P 732.326.2968
  • F 732.218.5759

Copyright © PREMIER Design + Build Group, LLC. All Rights Reserved.