top of page
gradient-2.jpg

Darien

Darien, Illinois

PREMIER completed construction of a 30’ clear height speculative industrial facility on a 9-acre parcel in DuPage County, Illinois. The project included demolition of existing buildings, curbs and gutters prior to construction. Building envelope materials consist of insulated, load-bearing, precast concrete wall panels, and structural steel. The facility features a 2000A 277/480 volt, 4-wire electrical service and T-5 LED motion sensor controlled lights with an ESFR sprinkler system, and an R-30, fully ballasted EPDM roofing system. The site includes 31 truck dock positions, two drive-in doors and 161 parking stalls.

bottom of page